The Shed Thread
#501 _447SBC_
Posted 25 April 2014 - 12:06 AM
Sent from my SM-P600 using Tapatalk
#502
Posted 25 April 2014 - 12:23 AM
cost me $51,000 for a 240 sqm, concrete floor , with a Bathroom, and all walled in, and walled in the shed, and leach drains, powered up and a mezzanine floor. Dave I
but that was 6 years ago
#503 _Liam_
Posted 25 April 2014 - 07:37 AM
I was about to say not much change out of 40K, and with the prices of steel gone up since 2008, bout 15%.
#505 _Liam_
Posted 25 April 2014 - 11:40 AM
What size is that Col? 7.5 x 7.5?
#506
Posted 25 April 2014 - 12:10 PM
9 x 7.3
#507
Posted 25 April 2014 - 01:24 PM
#508
Posted 25 April 2014 - 01:42 PM
Very Nice Job Done Col,
Now you have a Man Cave. Dave I
#509
Posted 26 April 2014 - 03:22 AM
Mine is 9 x 7 and I often wish I had an extra .3 or so, it's a bit squeezey once you put your crap in there :-)
Makes the back yard look a lot better and less lawn to mow too.
Now we are waiting for pics with a purple beast parked in there!!
Edited by Potta, 26 April 2014 - 03:23 AM.
#510 _447SBC_
Posted 26 April 2014 - 04:47 PM
Sent from my SM-P600 using Tapatalk
#511 _447SBC_
Posted 26 April 2014 - 04:50 PM
cost me $51,000 for a 240 sqm, concrete floor , with a Bathroom, and all walled in, and walled in the shed, and leach drains, powered up and a mezzanine floor. Dave I
but that was 6 years ago
Nice, did you get a contractor to do everything for you? My budget is $30,000 unfortunately but I'll be doing everything myself.
Anyone dealt with 'The shed company'? They sell zincalume and colourbond with very resonable prices as a kit.
Sent from my SM-P600 using Tapatalk
#512
Posted 26 April 2014 - 06:21 PM
Mezz floor is go
Attached Files
#513
Posted 26 April 2014 - 06:26 PM
Hi Luke,
The Company I used to do the slab and shed construction went bust,
and I now know why, they charge a lot for outside contractors and charged us extra after the shed was completed for the hiring of equipment.
I did all the inside stuff, bathroom, plumbing ( hot/cold ), mezzanine floor, all the walls and wiring, just had a sparky connect the shed with power.
Then I used a Contractor to dig the trenches and put the concrete leach drain arches and 3200 litre tank in. Dave I
Nice, did you get a contractor to do everything for you? My budget is $30,000 unfortunately but I'll be doing everything myself.
Anyone dealt with 'The shed company'? They sell zincalume and colourbond with very resonable prices as a kit.
Sent from my SM-P600 using Tapatalk
Great Man Datto, very nice Mezzanine Floor you have
#514
Posted 29 April 2014 - 02:12 AM
You'll get heaps of stuff up there!
#515
Posted 29 April 2014 - 07:46 PM
For the guys that have three phase power, whats involved and cost associated to get it hooked up?
Sent from my SM-P600 using Tapatalk
Cost. How long is a piece of string?
Been a while since I did this stuff.
Used to be about $250 to upgrade overhead line to house.
And about another $250 for the metering.
What is distance from pole to house?
Which state are you in?
The better question however is why do you think you need 3 phase power?
If you were going to air condition your whole house it would be worth it.
But just for pottering in the shed, hardly worth it. Unless you already have a lot of 3 phase equipment at your disposal.
#516
Posted 29 April 2014 - 08:22 PM
Thought you may also need to know this one.
I up-graded a single phase Transformer from 40 amps, to put in a 100 amp one:-
Transformer TOTAL Cost = $7500
plus $1500 for a Meter Box to connect the Transformer to the Meter Box
$14,000 for 50sqr mm metal shielded single phase Cable 210 metres long
and that is just for starters. Dave I
#517
Posted 29 April 2014 - 08:34 PM
Rural property I would be guessing there Dave?
#518
Posted 29 April 2014 - 08:41 PM
Special Rural Rob, 65kms east of Perth
50,000sqm land size
#519
Posted 29 April 2014 - 08:42 PM
Hill billy country lolSpecial Rural Rob, 65kms east of Perth
50,000sqm land size
#520
Posted 29 April 2014 - 08:46 PM
no smog out here Bud
some day's, when descending into the Perth Smog, I think, do I really need to do this
#521
Posted 29 April 2014 - 08:46 PM
no smog out here Bud
I dont doubt it that far away from the cbd
#522
Posted 29 April 2014 - 10:16 PM
Mate of mine paid close to 100k to get power to his house. Single phase only.
Had to run about 1km of poles and wire.
If anyone else connects in the future he will get reimbursed a percentage.
Its over 20 years now and no one else has built out there.
#523
Posted 29 April 2014 - 10:20 PM
#524
Posted 29 April 2014 - 10:45 PM
I had a property like that once Rod,
only cost me $40 yep $40 to get the power connected, and that included 3 power poles.
There were 20 houses already there and they were 3.5 acre lots,
I had a 3 bedroom transportable house put there in 1982. Dave I
#525
Posted 30 April 2014 - 04:53 PM
Yeah back in the good old days when things got done.
Another mate had 3 phase power and phone put to his property for the basic connection fees.
His driveway would be close to 3 km long.
Now you pay for it but the authority owns it and maintains it.
First bloke had about 6 poles and a transformer.
This bloke had frock loads of poles and a transformer.
Years ago they provided the service.
Now it is user pays.
And they know how to charge now as well.