Old Skool One Tonner ( race car)
#26 _2DOOR_
Posted 03 May 2011 - 09:48 PM
#27 _2DOOR_
Posted 06 May 2011 - 11:31 PM
#28
Posted 12 May 2011 - 11:46 PM
#29 _2DOOR_
Posted 26 May 2011 - 08:11 PM
#30 _2DOOR_
Posted 20 June 2011 - 08:45 PM
guards bolt to the chassis, tyres will be 2inch taller than these.
cutting up an old chassis
#31 _LJ355_
Posted 20 June 2011 - 09:11 PM
#32 _2DOOR_
Posted 25 June 2011 - 05:33 PM
the look we were after, business like.
the roll bar is only cosmetic, but will be part of the closing system for the tilting tray.
The tray needs a little more grinding, support plates across the guards, and some Dzus plates attached and its done.
#33 _2DOOR_
Posted 25 July 2011 - 09:37 PM
welding guard extensions
we dont race in the rain so!!
28 less holes
made a nice flat surface to mount the ratchet shifter to.
#34 _2DOOR_
Posted 12 August 2011 - 07:14 PM
37 litre fuel cell
line lock in place of the load proportioning valve.
#35 _LJ355_
Posted 12 August 2011 - 09:16 PM
#36 _2DOOR_
Posted 12 August 2011 - 10:18 PM
#37 _LJ355_
Posted 13 August 2011 - 07:25 AM
#38 _2DOOR_
Posted 21 August 2011 - 02:54 PM
LS1 & 4L65E
#39
Posted 21 August 2011 - 04:10 PM
#40 _L32M20_
Posted 21 August 2011 - 05:09 PM
#41 _2DOOR_
Posted 24 August 2011 - 08:07 PM
I thought I would put up a few of the projects that get in the way of the racecar, yr12 major projects.
1979 Gemini, replaced a lot of the rear window metal and resprayed in Atlantis Blue.
Diahatsu Charade caved in roof and full respray, inside and out.
XR6 bonnet fitted with XR8 bonnet scoop and shadow graphics.
air brushed over stencils.
a timber project.
the students create the project and put together an 80 page portfolio.
#42
Posted 24 August 2011 - 09:10 PM
#43 _2DOOR_
Posted 01 September 2011 - 07:19 PM
cut the alloy for the tray
very impressed with how well the boys planned and attacked the engine removal.
now we need a sump, pick up and to make the engine mounts and a cross member
#44 _L32M20_
Posted 01 September 2011 - 08:10 PM
Edited by L32M20, 01 September 2011 - 08:12 PM.
#45 _2DOOR_
Posted 09 September 2011 - 10:31 PM
starting on the bodywork
designing a battery box
fitted the fuel cell
#46
Posted 10 September 2011 - 07:48 AM
#47 _2DOOR_
Posted 13 September 2011 - 08:38 PM
the angles are right using the standard cross member.
#48 _2DOOR_
Posted 16 September 2011 - 10:07 PM
solid engine mounts
we started fabricating a new crossmember to sit the trans 50mm lower.
#49
Posted 13 October 2011 - 09:41 PM
#50 _2DOOR_
Posted 16 October 2011 - 08:05 PM
actually had a holiday this time so we slowed a little, first week back and the ute is totally stripped and the cross member fabricated.
2 user(s) are reading this topic
0 members, 2 guests, 0 anonymous users